{"id":4811,"date":"2026-06-03T10:54:34","date_gmt":"2026-06-03T10:54:34","guid":{"rendered":"https:\/\/www.piller.com\/de-de\/?p=4811"},"modified":"2026-06-03T10:54:34","modified_gmt":"2026-06-03T10:54:34","slug":"bergen-engines-signs-approx-750mw-u-s-power-agreement-with-crusoe-for-ai-data-centers","status":"publish","type":"post","link":"https:\/\/www.piller.com\/de-de\/blog\/bergen-engines-signs-approx-750mw-u-s-power-agreement-with-crusoe-for-ai-data-centers\/","title":{"rendered":"Bergen Engines Signs Approx. 750MW U.S. Power Agreement with Crusoe for AI Data Centers"},"content":{"rendered":"<h4>Deal reflects continued shift toward dedicated on-site power generation for artificial intelligence infrastructure.<\/h4>\n<p><strong>BERGEN, NORWAY \/ DENVER, CO<\/strong>\u00a0\u2013 Bergen Engines has signed an agreement with\u00a0<a href=\"https:\/\/www.crusoe.ai\/\">Crusoe, the AI factory company,<\/a>\u00a0to provide 750 megawatts (MW) of power generation capacity for AI data center infrastructure in the United States. The agreement includes approximately a 438MW contract and 310 MW letter of intent (LOI).<\/p>\n<p>Crusoe is an energy-first, vertically integrated AI infrastructure provider. The company develops large-scale AI data center campuses directly in areas with abundant energy, sourcing from the grid, natural gas, solar, wind, battery storage, and other inputs. Rather than relying solely on grid connections, Crusoe often deploys on-site and behind-the-meter generation alongside grid-connected power \u2013 using the right mix for each campus to deliver reliable, continuous capacity at the scale AI workloads demand. The company has rapidly grown its portfolio through gigawatt-scale campus developments and partnerships with hyperscale customers across the United States.<\/p>\n<p>\u201cThe pace of AI infrastructure development demands builders who treat power as a first-class AI infrastructure layer,\u201d said John Adams, SVP of Power, Crusoe. \u201cBergen\u2019s gensets give us the reliable baseload power we need to energize large-scale campuses \u2013 deployable on our timeline. We\u2019re building AI factories at record speed, and this agreement helps us maintain that pace.\u201d<\/p>\n<p>Bergen\u2019s natural gas gensets will provide continuous on-site baseload power generation capability\u00a0<a href=\"https:\/\/www.bergenengines.com\/on-land\/grid-free-power\/\">to support 24\/7 compute workloads<\/a>\u00a0as demand scales.<\/p>\n<p>Under the agreement, Bergen will supply\u00a0<a href=\"https:\/\/www.bergenengines.com\/engines\/bergen-b3645v\/\">27 x B36:45V20AG2 (12.5MWe)<\/a>\u00a0gensets alongside\u00a0<a href=\"https:\/\/www.bergenengines.com\/engines\/bergen-b3645l\/\">20 x B36:45L9AG (5MWe)<\/a>\u00a0as part of the initial 438 MW contract. The 310 MW LOI includes additional units of the same platforms. The engines will be delivered to multiple Crusoe data center locations in the US, phased through 2027.<\/p>\n<p>The gensets feature alternators from\u00a0<a href=\"https:\/\/www.marellimotori.com\/\">Marelli Motori<\/a>\u00a0and integrated with\u00a0<a href=\"https:\/\/www.piller.com\/product\/shieldx-dynamic-power-stabilisation\/\">SHIELD-X\u2122 Dynamic Power Stabilization technology<\/a>\u00a0from\u00a0<a href=\"https:\/\/www.piller.com\/\">Piller Power Systems<\/a>\u00a0to counteract rapid changes in electricity demand, which become more common with computing-intensive tasks.<\/p>\n<img loading=\"lazy\" decoding=\"async\" class=\"alignnone wp-image-4534 size-full\" src=\"https:\/\/www.piller.com\/de-de\/wp-content\/uploads\/sites\/2\/2025\/11\/Shield-X-bergen-1-scaled.png\" alt=\"\" width=\"2560\" height=\"1440\" srcset=\"https:\/\/www.piller.com\/de-de\/wp-content\/uploads\/sites\/2\/2025\/11\/Shield-X-bergen-1-scaled.png 2560w, https:\/\/www.piller.com\/de-de\/wp-content\/uploads\/sites\/2\/2025\/11\/Shield-X-bergen-1-800x450.png 800w, https:\/\/www.piller.com\/de-de\/wp-content\/uploads\/sites\/2\/2025\/11\/Shield-X-bergen-1-1200x675.png 1200w, https:\/\/www.piller.com\/de-de\/wp-content\/uploads\/sites\/2\/2025\/11\/Shield-X-bergen-1-400x225.png 400w, https:\/\/www.piller.com\/de-de\/wp-content\/uploads\/sites\/2\/2025\/11\/Shield-X-bergen-1-2000x1125.png 2000w\" sizes=\"auto, (max-width: 2560px) 100vw, 2560px\" \/>\n<p>\u201cAI workloads have a distinct power profile that demands purpose-built generation and stabilization technology\u201d said Dean Richards, CEO of Piller Power Systems. \u201cSHIELD-X\u2122 is designed to manage those dynamics, protecting the generation assets and maintaining stable plant operation, while ensuring consistent power quality for the data center.\u201d<\/p>\n<p>Operators of AI data centers need infrastructure capable of handling dense computing clusters that can use large amounts of power. Often, developers opt for on-site or near-site generation due to slow interconnection process, or a lack of available capacity in some U.S. regions.<\/p>\n<p>\u201cThe pace of AI infrastructure development is unlike anything the power generation industry has seen before,\u201d said Theo Lorentzos, VP Sales, Bergen Engines Americas. \u201cIn this market, access to power determines how fast you can scale. Crusoe\u2019s model is built around speed and stable power, and our solution is designed to deliver both. Our gensets can be deployed and running very quickly, and their power density allows operators to deliver large-scale capacity within a smaller footprint than alternative technologies, without waiting on the grid.\u201d<\/p>\n<p>The Bergen Engines and Crusoe agreement is part of a broader expansion of behind-the-meter power systems for AI infrastructure in the United States. These systems are chosen to support faster buildouts of large-scale computing capacity while reducing dependence on traditional utility timelines.<\/p>\n<h4>Contact:\u00a0<a href=\"mailto:PowerOn@langleyholdings.com\">PowerOn@langleyholdings.com<\/a><\/h4>\n<p>____________________<\/p>\n<p><strong>ABOUT BERGEN ENGINES<\/strong><br \/>\n<a href=\"https:\/\/www.bergenengines.com\/\">Bergen Engines<\/a>\u00a0produces medium-speed engines and generators set to a broad range of land-based, commercial marine, and naval applications. The Bergen name is a watchword for quality and reliability in its field. The tradition of engineering in Bergen, Norway, dates to 1855 when the original company Bergen Mekaniske Verksted (BMV) was founded. In 1946, the company built its first diesel engine and has since commissioned over 7,500 of its iconic liquid and gas fueled engines. Around half of them are still in operation today. Formerly Rolls-Royce Bergen Engines, on 31st December 2021, the company became part of the privately owned British engineering group, Langley Holdings plc.<\/p>\n<p><strong>ABOUT PILLER POWER SYSTEMS<\/strong><br \/>\nPiller technology is the Gold Standard premium power technology. For many of the world\u2019s best known central banks, stock exchanges, financial institutions and governmental agencies; data center operators, telecoms networks and airports, hospitals, semiconductor and pharmaceutical manufacturers, Piller is the go-to technology for mission-critical power reliability. And now, as AI data center operators increasingly go to behind-the-meter (BTM) power, Piller technology is finding a whole new purpose managing AI transients and BTM load steps with ease. In 2016 Piller acquired the Austin TX kinetic energy storage producer, Active Power Inc. Piller Group GmbH is a wholly owned subsidiary of the UK engineering and industrial group, Langley Holdings plc and is part of the Power Solutions Division.<\/p>\n<p><strong>ABOUT CRUSOE<\/strong><br \/>\nAs the AI factory company, Crusoe is on a mission to accelerate the abundance of energy and intelligence. The company provides a reliable, scalable, cost-effective, energy-first solution for AI infrastructure. By harnessing largescale energy sources, building AI-optimized data centers, and delivering a powerful AI cloud platform, Crusoe empowers its customers and partners to build the future faster.<\/p>\n<p>____________________<\/p>\n<p><strong>THE PARENT BEHIND THE POWER<\/strong><br \/>\n<a href=\"https:\/\/www.langleyholdings.com\/\">Langley Holdings plc,<\/a>\u00a0the parent company of\u00a0<a href=\"https:\/\/www.bergenengines.com\/\">Bergen Engines<\/a>,\u00a0<a href=\"https:\/\/www.piller.com\/\">Piller Power Systems<\/a>\u00a0and\u00a0<a href=\"https:\/\/www.marellimotori.com\/\">Marelli Motori,<\/a>\u00a0is a global industrial group employing more than 5,000 people, generating $2.0 billion in annual revenues, and remaining 100% family-owned.<\/p>\n<p>The Group operates across a broad spectrum of industries, with its Power Solutions Division strategically focused on powering the rapidly emerging AI data center sector and addressing the critical energy demands driven by high-density compute.<\/p>\n<p>____________________<\/p>\n<p><strong>Langley Holdings Contact:<\/strong><br \/>\nCrista Baxter<br \/>\nHead of Marketing &amp; Corporate Comms<br \/>\n+44 (0) 1777 700039 \/\/\u00a0<a href=\"mailto:crista.baxter@langleyholdings.com\">crista.baxter@langleyholdings.com<\/a><\/p>\n<p><strong>Bergen Engines Contact:<\/strong><br \/>\nJordan Paquet<br \/>\nMarketing &amp; Communications Specialist<br \/>\n+47 555 36 000 \/\/\u00a0<a href=\"mailto:jordan.paquet@bergenengines.com\">jordan.paquet@bergenengines.com<\/a><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Deal reflects continued shift toward dedicated on-site power generation for artificial intelligence infrastructure. BERGEN, NORWAY \/ DENVER, CO\u00a0\u2013 Bergen Engines has signed an agreement with\u00a0Crusoe, the AI factory company,\u00a0to provide 750 megawatts (MW) of power generation capacity for AI data center infrastructure in the United States. The agreement includes approximately a 438MW contract and 310 [&hellip;]<\/p>\n","protected":false},"author":4,"featured_media":4810,"comment_status":"closed","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[1],"class_list":["post-4811","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-industries"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v25.6 - https:\/\/yoast.com\/wordpress\/plugins\/seo\/ -->\n<title>Bergen Engines Signs Approx. 750MW U.S. Power Agreement with Crusoe for AI Data Centers - Deutsch<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.piller.com\/de-de\/blog\/bergen-engines-signs-approx-750mw-u-s-power-agreement-with-crusoe-for-ai-data-centers\/\" \/>\n<meta property=\"og:locale\" content=\"de_DE\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Bergen Engines Signs Approx. 750MW U.S. Power Agreement with Crusoe for AI Data Centers - Deutsch\" \/>\n<meta property=\"og:description\" content=\"Deal reflects continued shift toward dedicated on-site power generation for artificial intelligence infrastructure. BERGEN, NORWAY \/ DENVER, CO\u00a0\u2013 Bergen Engines has signed an agreement with\u00a0Crusoe, the AI factory company,\u00a0to provide 750 megawatts (MW) of power generation capacity for AI data center infrastructure in the United States. The agreement includes approximately a 438MW contract and 310 [&hellip;]\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.piller.com\/de-de\/blog\/bergen-engines-signs-approx-750mw-u-s-power-agreement-with-crusoe-for-ai-data-centers\/\" \/>\n<meta property=\"og:site_name\" content=\"Deutsch\" \/>\n<meta property=\"article:published_time\" content=\"2026-06-03T10:54:34+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/www.piller.com\/de-de\/wp-content\/uploads\/sites\/2\/2026\/06\/IMG_1999-scaled-1-1200x782.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"1200\" \/>\n\t<meta property=\"og:image:height\" content=\"782\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"elizabeth\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Verfasst von\" \/>\n\t<meta name=\"twitter:data1\" content=\"elizabeth\" \/>\n\t<meta name=\"twitter:label2\" content=\"Gesch\u00e4tzte Lesezeit\" \/>\n\t<meta name=\"twitter:data2\" content=\"6\u00a0Minuten\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\/\/www.piller.com\/de-de\/blog\/bergen-engines-signs-approx-750mw-u-s-power-agreement-with-crusoe-for-ai-data-centers\/\",\"url\":\"https:\/\/www.piller.com\/de-de\/blog\/bergen-engines-signs-approx-750mw-u-s-power-agreement-with-crusoe-for-ai-data-centers\/\",\"name\":\"Bergen Engines Signs Approx. 750MW U.S. Power Agreement with Crusoe for AI Data Centers - Deutsch\",\"isPartOf\":{\"@id\":\"https:\/\/www.piller.com\/de-de\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\/\/www.piller.com\/de-de\/blog\/bergen-engines-signs-approx-750mw-u-s-power-agreement-with-crusoe-for-ai-data-centers\/#primaryimage\"},\"image\":{\"@id\":\"https:\/\/www.piller.com\/de-de\/blog\/bergen-engines-signs-approx-750mw-u-s-power-agreement-with-crusoe-for-ai-data-centers\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/www.piller.com\/de-de\/wp-content\/uploads\/sites\/2\/2026\/06\/IMG_1999-scaled-1.jpg\",\"datePublished\":\"2026-06-03T10:54:34+00:00\",\"author\":{\"@id\":\"https:\/\/www.piller.com\/de-de\/#\/schema\/person\/e12250ce8155ea32d4d77b78df52fd1f\"},\"breadcrumb\":{\"@id\":\"https:\/\/www.piller.com\/de-de\/blog\/bergen-engines-signs-approx-750mw-u-s-power-agreement-with-crusoe-for-ai-data-centers\/#breadcrumb\"},\"inLanguage\":\"de\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/www.piller.com\/de-de\/blog\/bergen-engines-signs-approx-750mw-u-s-power-agreement-with-crusoe-for-ai-data-centers\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"de\",\"@id\":\"https:\/\/www.piller.com\/de-de\/blog\/bergen-engines-signs-approx-750mw-u-s-power-agreement-with-crusoe-for-ai-data-centers\/#primaryimage\",\"url\":\"https:\/\/www.piller.com\/de-de\/wp-content\/uploads\/sites\/2\/2026\/06\/IMG_1999-scaled-1.jpg\",\"contentUrl\":\"https:\/\/www.piller.com\/de-de\/wp-content\/uploads\/sites\/2\/2026\/06\/IMG_1999-scaled-1.jpg\",\"width\":2560,\"height\":1668},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/www.piller.com\/de-de\/blog\/bergen-engines-signs-approx-750mw-u-s-power-agreement-with-crusoe-for-ai-data-centers\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\/\/www.piller.com\/de-de\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Bergen Engines Signs Approx. 750MW U.S. Power Agreement with Crusoe for AI Data Centers\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/www.piller.com\/de-de\/#website\",\"url\":\"https:\/\/www.piller.com\/de-de\/\",\"name\":\"Deutsch\",\"description\":\"Deutsch\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/www.piller.com\/de-de\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"de\"},{\"@type\":\"Person\",\"@id\":\"https:\/\/www.piller.com\/de-de\/#\/schema\/person\/e12250ce8155ea32d4d77b78df52fd1f\",\"name\":\"elizabeth\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"de\",\"@id\":\"https:\/\/www.piller.com\/de-de\/#\/schema\/person\/image\/\",\"url\":\"https:\/\/secure.gravatar.com\/avatar\/8823e33ca866c2e142e1fa2c12c6a56e61dd4d417334ef455da7893b451ec672?s=96&d=mm&r=g\",\"contentUrl\":\"https:\/\/secure.gravatar.com\/avatar\/8823e33ca866c2e142e1fa2c12c6a56e61dd4d417334ef455da7893b451ec672?s=96&d=mm&r=g\",\"caption\":\"elizabeth\"},\"url\":\"https:\/\/www.piller.com\/de-de\/blog\/author\/elizabeths\/\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Bergen Engines Signs Approx. 750MW U.S. Power Agreement with Crusoe for AI Data Centers - Deutsch","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.piller.com\/de-de\/blog\/bergen-engines-signs-approx-750mw-u-s-power-agreement-with-crusoe-for-ai-data-centers\/","og_locale":"de_DE","og_type":"article","og_title":"Bergen Engines Signs Approx. 750MW U.S. Power Agreement with Crusoe for AI Data Centers - Deutsch","og_description":"Deal reflects continued shift toward dedicated on-site power generation for artificial intelligence infrastructure. BERGEN, NORWAY \/ DENVER, CO\u00a0\u2013 Bergen Engines has signed an agreement with\u00a0Crusoe, the AI factory company,\u00a0to provide 750 megawatts (MW) of power generation capacity for AI data center infrastructure in the United States. The agreement includes approximately a 438MW contract and 310 [&hellip;]","og_url":"https:\/\/www.piller.com\/de-de\/blog\/bergen-engines-signs-approx-750mw-u-s-power-agreement-with-crusoe-for-ai-data-centers\/","og_site_name":"Deutsch","article_published_time":"2026-06-03T10:54:34+00:00","og_image":[{"width":1200,"height":782,"url":"https:\/\/www.piller.com\/de-de\/wp-content\/uploads\/sites\/2\/2026\/06\/IMG_1999-scaled-1-1200x782.jpg","type":"image\/jpeg"}],"author":"elizabeth","twitter_card":"summary_large_image","twitter_misc":{"Verfasst von":"elizabeth","Gesch\u00e4tzte Lesezeit":"6\u00a0Minuten"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/www.piller.com\/de-de\/blog\/bergen-engines-signs-approx-750mw-u-s-power-agreement-with-crusoe-for-ai-data-centers\/","url":"https:\/\/www.piller.com\/de-de\/blog\/bergen-engines-signs-approx-750mw-u-s-power-agreement-with-crusoe-for-ai-data-centers\/","name":"Bergen Engines Signs Approx. 750MW U.S. Power Agreement with Crusoe for AI Data Centers - Deutsch","isPartOf":{"@id":"https:\/\/www.piller.com\/de-de\/#website"},"primaryImageOfPage":{"@id":"https:\/\/www.piller.com\/de-de\/blog\/bergen-engines-signs-approx-750mw-u-s-power-agreement-with-crusoe-for-ai-data-centers\/#primaryimage"},"image":{"@id":"https:\/\/www.piller.com\/de-de\/blog\/bergen-engines-signs-approx-750mw-u-s-power-agreement-with-crusoe-for-ai-data-centers\/#primaryimage"},"thumbnailUrl":"https:\/\/www.piller.com\/de-de\/wp-content\/uploads\/sites\/2\/2026\/06\/IMG_1999-scaled-1.jpg","datePublished":"2026-06-03T10:54:34+00:00","author":{"@id":"https:\/\/www.piller.com\/de-de\/#\/schema\/person\/e12250ce8155ea32d4d77b78df52fd1f"},"breadcrumb":{"@id":"https:\/\/www.piller.com\/de-de\/blog\/bergen-engines-signs-approx-750mw-u-s-power-agreement-with-crusoe-for-ai-data-centers\/#breadcrumb"},"inLanguage":"de","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.piller.com\/de-de\/blog\/bergen-engines-signs-approx-750mw-u-s-power-agreement-with-crusoe-for-ai-data-centers\/"]}]},{"@type":"ImageObject","inLanguage":"de","@id":"https:\/\/www.piller.com\/de-de\/blog\/bergen-engines-signs-approx-750mw-u-s-power-agreement-with-crusoe-for-ai-data-centers\/#primaryimage","url":"https:\/\/www.piller.com\/de-de\/wp-content\/uploads\/sites\/2\/2026\/06\/IMG_1999-scaled-1.jpg","contentUrl":"https:\/\/www.piller.com\/de-de\/wp-content\/uploads\/sites\/2\/2026\/06\/IMG_1999-scaled-1.jpg","width":2560,"height":1668},{"@type":"BreadcrumbList","@id":"https:\/\/www.piller.com\/de-de\/blog\/bergen-engines-signs-approx-750mw-u-s-power-agreement-with-crusoe-for-ai-data-centers\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.piller.com\/de-de\/"},{"@type":"ListItem","position":2,"name":"Bergen Engines Signs Approx. 750MW U.S. Power Agreement with Crusoe for AI Data Centers"}]},{"@type":"WebSite","@id":"https:\/\/www.piller.com\/de-de\/#website","url":"https:\/\/www.piller.com\/de-de\/","name":"Deutsch","description":"Deutsch","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.piller.com\/de-de\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"de"},{"@type":"Person","@id":"https:\/\/www.piller.com\/de-de\/#\/schema\/person\/e12250ce8155ea32d4d77b78df52fd1f","name":"elizabeth","image":{"@type":"ImageObject","inLanguage":"de","@id":"https:\/\/www.piller.com\/de-de\/#\/schema\/person\/image\/","url":"https:\/\/secure.gravatar.com\/avatar\/8823e33ca866c2e142e1fa2c12c6a56e61dd4d417334ef455da7893b451ec672?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/8823e33ca866c2e142e1fa2c12c6a56e61dd4d417334ef455da7893b451ec672?s=96&d=mm&r=g","caption":"elizabeth"},"url":"https:\/\/www.piller.com\/de-de\/blog\/author\/elizabeths\/"}]}},"_links":{"self":[{"href":"https:\/\/www.piller.com\/de-de\/wp-json\/wp\/v2\/posts\/4811","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.piller.com\/de-de\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.piller.com\/de-de\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.piller.com\/de-de\/wp-json\/wp\/v2\/users\/4"}],"replies":[{"embeddable":true,"href":"https:\/\/www.piller.com\/de-de\/wp-json\/wp\/v2\/comments?post=4811"}],"version-history":[{"count":1,"href":"https:\/\/www.piller.com\/de-de\/wp-json\/wp\/v2\/posts\/4811\/revisions"}],"predecessor-version":[{"id":4812,"href":"https:\/\/www.piller.com\/de-de\/wp-json\/wp\/v2\/posts\/4811\/revisions\/4812"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.piller.com\/de-de\/wp-json\/wp\/v2\/media\/4810"}],"wp:attachment":[{"href":"https:\/\/www.piller.com\/de-de\/wp-json\/wp\/v2\/media?parent=4811"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.piller.com\/de-de\/wp-json\/wp\/v2\/categories?post=4811"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}