{"id":2904,"date":"2025-06-06T14:10:30","date_gmt":"2025-06-06T14:10:30","guid":{"rendered":"https:\/\/www.piller.com\/zh-cn\/?p=2904"},"modified":"2025-07-30T08:19:31","modified_gmt":"2025-07-30T08:19:31","slug":"bergen-engines-first-ai-dedicated-power-plant-in-the-usa","status":"publish","type":"post","link":"https:\/\/www.piller.com\/zh-cn\/bergen-engines-first-ai-dedicated-power-plant-in-the-usa\/","title":{"rendered":"Bergen Engines\u2019 First AI-Dedicated Power Plant in the USA"},"content":{"rendered":"<p><strong>Bergen, Norway<\/strong>\u00a0\u2014 Bergen Engines (formerly Rolls-Royce Bergen Engines) has secured an order commitment for its first independent power solution for a new state-of-the-art AI data center in the USA.<\/p>\n<p>Developed and designed by E-Finity Distributed Generation, a leading energy developer, the Bergen plant will deliver over 130MW of initial capacity, with future expansions planned to meet the rapidly growing demand for AI infrastructure.<\/p>\n<p>Bergen Engines will supply twelve (12) B36:45V20 medium-speed lean-burn gas engines, each producing 11.2MW of electrical power at 60Hz in the first phase of the project. The engines will be configured as an (n+3) system and fitted with generators from sister company Marelli Motori.<\/p>\n<p>This configuration will ensure the continuous delivery of robust, efficient, and scalable power \u2014 perfectly matched to the burgeoning demands of AI infrastructure.<\/p>\n<p>The first deliveries are scheduled for later this year, with the data center power plant expected to go live in 2026.<\/p>\n<h6><img loading=\"lazy\" decoding=\"async\" class=\"alignnone wp-image-2907 size-full\" src=\"https:\/\/www.piller.com\/zh-cn\/wp-content\/uploads\/sites\/7\/2025\/06\/Theo-Lorentzos.jpg\" alt=\"\" width=\"2000\" height=\"1319\" srcset=\"https:\/\/www.piller.com\/zh-cn\/wp-content\/uploads\/sites\/7\/2025\/06\/Theo-Lorentzos.jpg 2000w, https:\/\/www.piller.com\/zh-cn\/wp-content\/uploads\/sites\/7\/2025\/06\/Theo-Lorentzos-800x528.jpg 800w, https:\/\/www.piller.com\/zh-cn\/wp-content\/uploads\/sites\/7\/2025\/06\/Theo-Lorentzos-1200x791.jpg 1200w, https:\/\/www.piller.com\/zh-cn\/wp-content\/uploads\/sites\/7\/2025\/06\/Theo-Lorentzos-400x264.jpg 400w\" sizes=\"auto, (max-width: 2000px) 100vw, 2000px\" \/><em>Jim Bondi, Partner &amp; Chief Operating Officer, E-Finity and Theo Lorentzos, Head of Sales Americas, Bergen Engines.<\/em><\/h6>\n<p><strong>Next-Gen Power Architecture for AI at Scale<\/strong><\/p>\n<p>The new site will be built around a behind-the-meter power strategy. The system is engineered to support high-density AI workloads, requiring high uptime availability, scalability, and uninterrupted operations. The combination of Bergen\u2019s medium-speed gensets with Marelli Motori generators was chosen to meet these demands with precision and performance.<\/p>\n<img loading=\"lazy\" decoding=\"async\" class=\"alignnone wp-image-2905 size-full\" src=\"https:\/\/www.piller.com\/zh-cn\/wp-content\/uploads\/sites\/7\/2025\/06\/B36-45V20-Genset_angle-with-man-Medium.webp\" alt=\"\" width=\"1234\" height=\"768\" srcset=\"https:\/\/www.piller.com\/zh-cn\/wp-content\/uploads\/sites\/7\/2025\/06\/B36-45V20-Genset_angle-with-man-Medium.webp 1234w, https:\/\/www.piller.com\/zh-cn\/wp-content\/uploads\/sites\/7\/2025\/06\/B36-45V20-Genset_angle-with-man-Medium-800x498.webp 800w, https:\/\/www.piller.com\/zh-cn\/wp-content\/uploads\/sites\/7\/2025\/06\/B36-45V20-Genset_angle-with-man-Medium-1200x747.webp 1200w, https:\/\/www.piller.com\/zh-cn\/wp-content\/uploads\/sites\/7\/2025\/06\/B36-45V20-Genset_angle-with-man-Medium-400x249.webp 400w\" sizes=\"auto, (max-width: 1234px) 100vw, 1234px\" \/>\n<div id=\"attachment_5071\" class=\"wp-caption alignnone\">\n<p id=\"caption-attachment-5071\" class=\"wp-caption-text\"><strong>Rapid Deployment and Industry-Leading Reliability<\/strong><\/p>\n<\/div>\n<p>Selected for both speed and dependability, Bergen Engines enables significantly reduced Time to Power (T2P), allowing rapid deployment compared to conventional alternatives \u2014 a critical advantage in today\u2019s fast-paced AI infrastructure market. The gensets are engineered for 99.999% uptime availability, exceeding typical grid reliability. This level of consistent, high-performance operation is essential for AI platforms where downtime is not an option.<\/p>\n<p>\u201cWe\u2019re proud to partner with Bergen Engines to deliver rapid, reliable, and scalable power for next-generation AI data centers,\u201d said Jim Bondi, Partner &amp; Chief Operating Officer at E-Finity. \u201cThis collaboration enables our clients achieve industry-leading uptime and operational flexibility as they scale to meet growing AI demands.\u201d<\/p>\n<p>\u201cAs the demand for AI data centers accelerates at an unprecedented pace, the limitations of existing grid infrastructure have become increasingly clear,\u201d said Theo Lorentzos, Head of Sales Americas at Bergen Engines. \u201cWe\u2019re experiencing a surge in demand for our engine solutions, as developers urgently seek power systems that can be deployed fast, with shorter Time to Power (T2P), deliver exceptional efficiency and reliability, and provide uptime availability levels of up to 99.999% \u2014 exceeding what the grid can typically offer. Our medium-speed solutions are rapidly becoming the preferred choice for powering the next generation of data centers.\u201d<\/p>\n<img loading=\"lazy\" decoding=\"async\" class=\"alignnone wp-image-2906 size-full\" src=\"https:\/\/www.piller.com\/zh-cn\/wp-content\/uploads\/sites\/7\/2025\/06\/Engines.png\" alt=\"\" width=\"980\" height=\"343\" srcset=\"https:\/\/www.piller.com\/zh-cn\/wp-content\/uploads\/sites\/7\/2025\/06\/Engines.png 980w, https:\/\/www.piller.com\/zh-cn\/wp-content\/uploads\/sites\/7\/2025\/06\/Engines-800x280.png 800w, https:\/\/www.piller.com\/zh-cn\/wp-content\/uploads\/sites\/7\/2025\/06\/Engines-400x140.png 400w\" sizes=\"auto, (max-width: 980px) 100vw, 980px\" \/>\n<p>Bergen Engines is owned by the British engineering firm Langley Holdings PLC. Under Langley\u2019s Power Solutions Division, Bergen works alongside Marelli Motori and Piller Power Systems to provide a complete technology suite for data center infrastructure, including reliable power generation and advanced power conditioning.<\/p>\n<p><strong>About Bergen Engines<\/strong><\/p>\n<p><a href=\"https:\/\/www.bergenengines.com\/\">Bergen Engines<\/a>\u00a0produces medium-speed liquid and gas fueled engines and generator sets are supplied to a broad range of land-based, commercial marine, and naval applications. The Bergen name is a watchword for quality and reliability in its field.<\/p>\n<p>The tradition of engineering in Bergen, Norway, dates to 1855 when the original company Bergen Mekaniske Verksted (BMV) was founded. In 1946, the company built its first diesel engine and has since commissioned over 7,500 of its iconic liquid and gas fueled engines. Around half of them are still in operation today; such is the quality and reliability of a Bergen engine.<\/p>\n<p>Formerly Rolls-Royce Bergen Engines, on 31st December 2021, the company became part of the privately owned British engineering group, Langley Holdings plc<\/p>\n<p><strong>About E-Finity<\/strong><\/p>\n<p>E-Finity Distributed Generation is a leading U.S. developer of advanced power infrastructure for critical facilities, with a primary focus on data centers and other mission-essential operations where uninterrupted reliability is paramount. Leveraging deep expertise in integrating natural gas generation, renewables, energy storage, and advanced control systems, E-Finity delivers turnkey solutions that ensure continuous, resilient power\u2014whether operating independently or in parallel with the grid. In addition to supporting critical infrastructure, E-Finity also develops sophisticated microgrid and distributed energy systems for industrial sites and communities. From initial concept through commissioning, E-Finity guarantees rapid deployment and long-term operational excellence for clients nationwide.<\/p>\n<p><strong>About Piller<\/strong><\/p>\n<p>Piller power conditioning and backup technology can be found in major mission-critical power applications globally. For many of the world\u2019s banks and financial institutions, governmental agencies, data centre operators, telecoms networks and airports, as well as hospitals, semiconductor and pharmaceutical manufacturers, Piller equipment is the go-to technology.<\/p>\n<p>Piller was founded by Anton Piller in Hamburg in 1909. Today the company is headquartered in Osterode, near Hanover in Germany, with subsidiaries across Europe, in the USA, India, Asia and Australia. The company employs around 1,000 people worldwide.<\/p>\n<p>In 2016 Piller acquired the Austin TX kinetic energy storage producer,\u00a0<a href=\"https:\/\/www.activepower.com\/\">Active Power Inc<\/a>.<\/p>\n<p>Piller Group GmbH is a wholly owned subsidiary of the UK engineering and industrial group,\u00a0<a href=\"https:\/\/www.langleyholdings.com\/\">Langley Holdings plc<\/a>\u00a0and is part of the<a href=\"https:\/\/www.langleyholdings.com\/our-divisions\/\">\u00a0Power Solutions Division<\/a>\u00a0together with\u00a0<a href=\"https:\/\/www.bergenengines.com\/\">Bergen Engines AS<\/a>\u00a0and\u00a0<a href=\"https:\/\/www.marellimotori.com\/\">Marelli Motori Srl<\/a>.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Bergen, Norway\u00a0\u2014 Bergen Engines (formerly Rolls-Royce B [&hellip;]<\/p>\n","protected":false},"author":5,"featured_media":2907,"comment_status":"closed","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[1],"class_list":["post-2904","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-industries"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v25.6 - https:\/\/yoast.com\/wordpress\/plugins\/seo\/ -->\n<title>Bergen Engines\u2019 First AI-Dedicated Power Plant in the USA - Chinese<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.piller.com\/zh-cn\/bergen-engines-first-ai-dedicated-power-plant-in-the-usa\/\" \/>\n<meta property=\"og:locale\" content=\"zh_CN\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Bergen Engines\u2019 First AI-Dedicated Power Plant in the USA - Chinese\" \/>\n<meta property=\"og:description\" content=\"Bergen, Norway\u00a0\u2014 Bergen Engines (formerly Rolls-Royce B [&hellip;]\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.piller.com\/zh-cn\/bergen-engines-first-ai-dedicated-power-plant-in-the-usa\/\" \/>\n<meta property=\"og:site_name\" content=\"Chinese\" \/>\n<meta property=\"article:published_time\" content=\"2025-06-06T14:10:30+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2025-07-30T08:19:31+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/www.piller.com\/zh-cn\/wp-content\/uploads\/sites\/7\/2025\/06\/Theo-Lorentzos.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"2000\" \/>\n\t<meta property=\"og:image:height\" content=\"1319\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"louise\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"\u4f5c\u8005\" \/>\n\t<meta name=\"twitter:data1\" content=\"louise\" \/>\n\t<meta name=\"twitter:label2\" content=\"\u9884\u8ba1\u9605\u8bfb\u65f6\u95f4\" \/>\n\t<meta name=\"twitter:data2\" content=\"6 \u5206\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\/\/www.piller.com\/zh-cn\/bergen-engines-first-ai-dedicated-power-plant-in-the-usa\/#article\",\"isPartOf\":{\"@id\":\"https:\/\/www.piller.com\/zh-cn\/bergen-engines-first-ai-dedicated-power-plant-in-the-usa\/\"},\"author\":{\"name\":\"louise\",\"@id\":\"https:\/\/www.piller.com\/zh-cn\/#\/schema\/person\/eb7f2c2f6dd53817c5a546d2173f74ef\"},\"headline\":\"Bergen Engines\u2019 First AI-Dedicated Power Plant in the USA\",\"datePublished\":\"2025-06-06T14:10:30+00:00\",\"dateModified\":\"2025-07-30T08:19:31+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\/\/www.piller.com\/zh-cn\/bergen-engines-first-ai-dedicated-power-plant-in-the-usa\/\"},\"wordCount\":848,\"publisher\":{\"@id\":\"https:\/\/www.piller.com\/zh-cn\/#organization\"},\"image\":{\"@id\":\"https:\/\/www.piller.com\/zh-cn\/bergen-engines-first-ai-dedicated-power-plant-in-the-usa\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/www.piller.com\/zh-cn\/wp-content\/uploads\/sites\/7\/2025\/06\/Theo-Lorentzos.jpg\",\"articleSection\":[\"Industries\"],\"inLanguage\":\"zh-Hans\"},{\"@type\":\"WebPage\",\"@id\":\"https:\/\/www.piller.com\/zh-cn\/bergen-engines-first-ai-dedicated-power-plant-in-the-usa\/\",\"url\":\"https:\/\/www.piller.com\/zh-cn\/bergen-engines-first-ai-dedicated-power-plant-in-the-usa\/\",\"name\":\"Bergen Engines\u2019 First AI-Dedicated Power Plant in the USA - Chinese\",\"isPartOf\":{\"@id\":\"https:\/\/www.piller.com\/zh-cn\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\/\/www.piller.com\/zh-cn\/bergen-engines-first-ai-dedicated-power-plant-in-the-usa\/#primaryimage\"},\"image\":{\"@id\":\"https:\/\/www.piller.com\/zh-cn\/bergen-engines-first-ai-dedicated-power-plant-in-the-usa\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/www.piller.com\/zh-cn\/wp-content\/uploads\/sites\/7\/2025\/06\/Theo-Lorentzos.jpg\",\"datePublished\":\"2025-06-06T14:10:30+00:00\",\"dateModified\":\"2025-07-30T08:19:31+00:00\",\"breadcrumb\":{\"@id\":\"https:\/\/www.piller.com\/zh-cn\/bergen-engines-first-ai-dedicated-power-plant-in-the-usa\/#breadcrumb\"},\"inLanguage\":\"zh-Hans\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/www.piller.com\/zh-cn\/bergen-engines-first-ai-dedicated-power-plant-in-the-usa\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"zh-Hans\",\"@id\":\"https:\/\/www.piller.com\/zh-cn\/bergen-engines-first-ai-dedicated-power-plant-in-the-usa\/#primaryimage\",\"url\":\"https:\/\/www.piller.com\/zh-cn\/wp-content\/uploads\/sites\/7\/2025\/06\/Theo-Lorentzos.jpg\",\"contentUrl\":\"https:\/\/www.piller.com\/zh-cn\/wp-content\/uploads\/sites\/7\/2025\/06\/Theo-Lorentzos.jpg\",\"width\":2000,\"height\":1319},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/www.piller.com\/zh-cn\/bergen-engines-first-ai-dedicated-power-plant-in-the-usa\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\/\/www.piller.com\/zh-cn\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Bergen Engines\u2019 First AI-Dedicated Power Plant in the USA\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/www.piller.com\/zh-cn\/#website\",\"url\":\"https:\/\/www.piller.com\/zh-cn\/\",\"name\":\"-\",\"description\":\"\u4e2d\u6587\",\"publisher\":{\"@id\":\"https:\/\/www.piller.com\/zh-cn\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/www.piller.com\/zh-cn\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"zh-Hans\"},{\"@type\":\"Organization\",\"@id\":\"https:\/\/www.piller.com\/zh-cn\/#organization\",\"name\":\"Piller Power\",\"url\":\"https:\/\/www.piller.com\/zh-cn\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"zh-Hans\",\"@id\":\"https:\/\/www.piller.com\/zh-cn\/#\/schema\/logo\/image\/\",\"url\":\"https:\/\/www.piller.com\/zh-cn\/wp-content\/uploads\/sites\/7\/2023\/07\/Group-40234.jpg\",\"contentUrl\":\"https:\/\/www.piller.com\/zh-cn\/wp-content\/uploads\/sites\/7\/2023\/07\/Group-40234.jpg\",\"width\":500,\"height\":500,\"caption\":\"Piller Power\"},\"image\":{\"@id\":\"https:\/\/www.piller.com\/zh-cn\/#\/schema\/logo\/image\/\"}},{\"@type\":\"Person\",\"@id\":\"https:\/\/www.piller.com\/zh-cn\/#\/schema\/person\/eb7f2c2f6dd53817c5a546d2173f74ef\",\"name\":\"louise\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"zh-Hans\",\"@id\":\"https:\/\/www.piller.com\/zh-cn\/#\/schema\/person\/image\/\",\"url\":\"https:\/\/secure.gravatar.com\/avatar\/36bf66d92ddd31b0e81e3f1c991fb42eed8abb29a8cc5f4288206133325d3803?s=96&d=mm&r=g\",\"contentUrl\":\"https:\/\/secure.gravatar.com\/avatar\/36bf66d92ddd31b0e81e3f1c991fb42eed8abb29a8cc5f4288206133325d3803?s=96&d=mm&r=g\",\"caption\":\"louise\"},\"url\":\"https:\/\/www.piller.com\/zh-cn\/author\/louisew\/\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Bergen Engines\u2019 First AI-Dedicated Power Plant in the USA - Chinese","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.piller.com\/zh-cn\/bergen-engines-first-ai-dedicated-power-plant-in-the-usa\/","og_locale":"zh_CN","og_type":"article","og_title":"Bergen Engines\u2019 First AI-Dedicated Power Plant in the USA - Chinese","og_description":"Bergen, Norway\u00a0\u2014 Bergen Engines (formerly Rolls-Royce B [&hellip;]","og_url":"https:\/\/www.piller.com\/zh-cn\/bergen-engines-first-ai-dedicated-power-plant-in-the-usa\/","og_site_name":"Chinese","article_published_time":"2025-06-06T14:10:30+00:00","article_modified_time":"2025-07-30T08:19:31+00:00","og_image":[{"width":2000,"height":1319,"url":"https:\/\/www.piller.com\/zh-cn\/wp-content\/uploads\/sites\/7\/2025\/06\/Theo-Lorentzos.jpg","type":"image\/jpeg"}],"author":"louise","twitter_card":"summary_large_image","twitter_misc":{"\u4f5c\u8005":"louise","\u9884\u8ba1\u9605\u8bfb\u65f6\u95f4":"6 \u5206"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/www.piller.com\/zh-cn\/bergen-engines-first-ai-dedicated-power-plant-in-the-usa\/#article","isPartOf":{"@id":"https:\/\/www.piller.com\/zh-cn\/bergen-engines-first-ai-dedicated-power-plant-in-the-usa\/"},"author":{"name":"louise","@id":"https:\/\/www.piller.com\/zh-cn\/#\/schema\/person\/eb7f2c2f6dd53817c5a546d2173f74ef"},"headline":"Bergen Engines\u2019 First AI-Dedicated Power Plant in the USA","datePublished":"2025-06-06T14:10:30+00:00","dateModified":"2025-07-30T08:19:31+00:00","mainEntityOfPage":{"@id":"https:\/\/www.piller.com\/zh-cn\/bergen-engines-first-ai-dedicated-power-plant-in-the-usa\/"},"wordCount":848,"publisher":{"@id":"https:\/\/www.piller.com\/zh-cn\/#organization"},"image":{"@id":"https:\/\/www.piller.com\/zh-cn\/bergen-engines-first-ai-dedicated-power-plant-in-the-usa\/#primaryimage"},"thumbnailUrl":"https:\/\/www.piller.com\/zh-cn\/wp-content\/uploads\/sites\/7\/2025\/06\/Theo-Lorentzos.jpg","articleSection":["Industries"],"inLanguage":"zh-Hans"},{"@type":"WebPage","@id":"https:\/\/www.piller.com\/zh-cn\/bergen-engines-first-ai-dedicated-power-plant-in-the-usa\/","url":"https:\/\/www.piller.com\/zh-cn\/bergen-engines-first-ai-dedicated-power-plant-in-the-usa\/","name":"Bergen Engines\u2019 First AI-Dedicated Power Plant in the USA - Chinese","isPartOf":{"@id":"https:\/\/www.piller.com\/zh-cn\/#website"},"primaryImageOfPage":{"@id":"https:\/\/www.piller.com\/zh-cn\/bergen-engines-first-ai-dedicated-power-plant-in-the-usa\/#primaryimage"},"image":{"@id":"https:\/\/www.piller.com\/zh-cn\/bergen-engines-first-ai-dedicated-power-plant-in-the-usa\/#primaryimage"},"thumbnailUrl":"https:\/\/www.piller.com\/zh-cn\/wp-content\/uploads\/sites\/7\/2025\/06\/Theo-Lorentzos.jpg","datePublished":"2025-06-06T14:10:30+00:00","dateModified":"2025-07-30T08:19:31+00:00","breadcrumb":{"@id":"https:\/\/www.piller.com\/zh-cn\/bergen-engines-first-ai-dedicated-power-plant-in-the-usa\/#breadcrumb"},"inLanguage":"zh-Hans","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.piller.com\/zh-cn\/bergen-engines-first-ai-dedicated-power-plant-in-the-usa\/"]}]},{"@type":"ImageObject","inLanguage":"zh-Hans","@id":"https:\/\/www.piller.com\/zh-cn\/bergen-engines-first-ai-dedicated-power-plant-in-the-usa\/#primaryimage","url":"https:\/\/www.piller.com\/zh-cn\/wp-content\/uploads\/sites\/7\/2025\/06\/Theo-Lorentzos.jpg","contentUrl":"https:\/\/www.piller.com\/zh-cn\/wp-content\/uploads\/sites\/7\/2025\/06\/Theo-Lorentzos.jpg","width":2000,"height":1319},{"@type":"BreadcrumbList","@id":"https:\/\/www.piller.com\/zh-cn\/bergen-engines-first-ai-dedicated-power-plant-in-the-usa\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.piller.com\/zh-cn\/"},{"@type":"ListItem","position":2,"name":"Bergen Engines\u2019 First AI-Dedicated Power Plant in the USA"}]},{"@type":"WebSite","@id":"https:\/\/www.piller.com\/zh-cn\/#website","url":"https:\/\/www.piller.com\/zh-cn\/","name":"-","description":"\u4e2d\u6587","publisher":{"@id":"https:\/\/www.piller.com\/zh-cn\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.piller.com\/zh-cn\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"zh-Hans"},{"@type":"Organization","@id":"https:\/\/www.piller.com\/zh-cn\/#organization","name":"Piller Power","url":"https:\/\/www.piller.com\/zh-cn\/","logo":{"@type":"ImageObject","inLanguage":"zh-Hans","@id":"https:\/\/www.piller.com\/zh-cn\/#\/schema\/logo\/image\/","url":"https:\/\/www.piller.com\/zh-cn\/wp-content\/uploads\/sites\/7\/2023\/07\/Group-40234.jpg","contentUrl":"https:\/\/www.piller.com\/zh-cn\/wp-content\/uploads\/sites\/7\/2023\/07\/Group-40234.jpg","width":500,"height":500,"caption":"Piller Power"},"image":{"@id":"https:\/\/www.piller.com\/zh-cn\/#\/schema\/logo\/image\/"}},{"@type":"Person","@id":"https:\/\/www.piller.com\/zh-cn\/#\/schema\/person\/eb7f2c2f6dd53817c5a546d2173f74ef","name":"louise","image":{"@type":"ImageObject","inLanguage":"zh-Hans","@id":"https:\/\/www.piller.com\/zh-cn\/#\/schema\/person\/image\/","url":"https:\/\/secure.gravatar.com\/avatar\/36bf66d92ddd31b0e81e3f1c991fb42eed8abb29a8cc5f4288206133325d3803?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/36bf66d92ddd31b0e81e3f1c991fb42eed8abb29a8cc5f4288206133325d3803?s=96&d=mm&r=g","caption":"louise"},"url":"https:\/\/www.piller.com\/zh-cn\/author\/louisew\/"}]}},"_links":{"self":[{"href":"https:\/\/www.piller.com\/zh-cn\/wp-json\/wp\/v2\/posts\/2904","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.piller.com\/zh-cn\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.piller.com\/zh-cn\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.piller.com\/zh-cn\/wp-json\/wp\/v2\/users\/5"}],"replies":[{"embeddable":true,"href":"https:\/\/www.piller.com\/zh-cn\/wp-json\/wp\/v2\/comments?post=2904"}],"version-history":[{"count":2,"href":"https:\/\/www.piller.com\/zh-cn\/wp-json\/wp\/v2\/posts\/2904\/revisions"}],"predecessor-version":[{"id":2979,"href":"https:\/\/www.piller.com\/zh-cn\/wp-json\/wp\/v2\/posts\/2904\/revisions\/2979"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.piller.com\/zh-cn\/wp-json\/wp\/v2\/media\/2907"}],"wp:attachment":[{"href":"https:\/\/www.piller.com\/zh-cn\/wp-json\/wp\/v2\/media?parent=2904"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.piller.com\/zh-cn\/wp-json\/wp\/v2\/categories?post=2904"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}